The roadwork on the overpass on Columbus Drive at Waterford Bridge Road resumes tomorrow.
That means lane reductions and delays throughout the project, which will continue until August. At least one lane in each direction will be maintained.
Pedestrian access will be maintained during construction.
Crews last year were upgrading sidewalks, the median, and the areas beneath the overpass. This year, they will focus on removing old asphalt and repaving the deck of the bridge, and structural repairs.






















