The January blizzard is still having effects on the T’railway in Conception Bay South.
The west end of the T’railway remains closed from Delaney’s Road to Indian Pond Place due to extensive damage spanning about 10 kilometres in total.
Mayor Terry French says the portion of the trail that is closed should not be used at anytime. He explains that large repairs like this one cannot happen overnight.
However, the portions at the east end from Delaney’s road to Spruce Hill Road remain open and groomed along with the trail starting at the Kiwanis Club.
View the full statement from the Town of CBS at this link.
Advisory: We are advising the public to refrain from using the closed section of the T'Railway. This drone photo shows the severity of erosion and damage caused by the January blizzard.
Read: https://t.co/INoaNDFFp6 pic.twitter.com/6LsY7KOExF
— Conception Bay South (@TownofCBS) February 21, 2020